AndrewBlue 2011 10 12 Information for ATLAS Strip upgrade work at Glasgow The following are pages that provide information on the Strips upgrade testing and building...
Beetle MIP test setup This is the strip detector test setup in room 342, which uses LHCb electronics. Inside the test box, there is the strip detector being tested...
EUTelescope And IBL Testbeam pages Notes on customising analysis of IBL testbeam data using tbmon . Analysis Cuts Various cuts are available in each of the analysis...
Customising IBL Reconstruction Notes on customising reconstruction process for ITk (formerly IBL) testbeam data using EUTelescope software. NB this is a perilous process...
Data Acquisition with EUDAQ This page gives some details on test beam data acquisition using EUDAQ software. See official pages for more information and installation...
Detector Development Journal Club The DetDev journal club meets on Tuesday (weekly) in room 253, where the det dev fortnightly meetings are held. We meet at 14:...
Mike Wormald ATLAS Upgrade Bonding programs referencing documents http://hep.ph.liv.ac.uk/~mpw/page2.html MIL STD 883E, Test Method Standard for Microcircuits...
Glasgow ATLAS pixel work Some local items on Glasgow work on ATLAS pixels that are not covered on PUUKA. MUX development final May 2014.pptx: Final PPT from...
AndrewBlue 2011 10 12 The normal set of electrical tests that are conducted for both hybrids and modules are as follows (conducted sequentially): Strobe Delay...
HV HR CMOS sensor work in Glasgow The Glasgow group has had many years of experience working on CMOS sensors (including the HEPAPS and MI3 projects) which are detailed...
AndrewBlue 2012 02 20 Jigs All are labelled with T to indicate the Top of each jig J Heights set up (From Liverpool) A Not shimmed (Glasgow) B Not set up (Glasgow...
Title Article text. This page will detail the scans made by ITSDAQ necessary to test DAQloads, Hybrids and Modules ITSDAQ HCC Chip ID Strobe Delay 3pt Gain...
IV and CV measurments Measurements performed by Alex Chilingarov, University of Lancaster and analysis is done by Lars Eklund, University of Glasgow. Summary plots...
Lab and software information If you`ve got any documentation, test procedures or code for lab equipment and software, please add it! Readout Setups Beetle...
Thin film hybrid in MCM D technology Processing on blank silicon wafers to determine the feasibility of building a fully functional circuit in this technology. The...
Estimates of the total capacitive load The capacitive load on the front end is expected to change due to the presence of a ground plane close to the strips. The capacitance...
Inter strip capacitance measurments Measurements performed by Alex Chilingarov, University of Lancaster and analysis is done by Lars Eklund, University of Glasgow...
Measurement of capacitance between strip and GND plane Measurements performed by Alex Chilingarov at Lancaster University Introduction The impedance between the...
Reference documents Alex Chilingarovs note on Ris measurements: note Alex Chilingarovs notes on capacitance to GND plane: I, II NIM paper on metal planes and oxide...
Flatness measurement done with interferometer in Glasgow Scan of 23 frames with 480x640 measurement points in each frame, in a line across the sensor. From this a...
Specification of the MCMD hybrid The first version of a fully working hybrid will electrically fully working but implemented on blank wafers. Hence no connections...
IV and CV measurments Measurements performed by Alex Chilingarov, University of Lancaster and analysis is done by Lars Eklund, University of Glasgow. Summary plots...
Photos at reception of Run 1 wafers The photos were taken at reception of the wafers, but after wafers w09 and w14 had some of their ground planes bonded to the bias...
Measurement of inter strip resistance Measurements by Alex Chilingarov, Lancaster University Description of the measurement The inter strip resistance is measured...
Via yield measurements of Run 1 Measurements of w04 (12 um BCB, mechanical) Probing double vias on same pad: 24 sensors 4 pads 2 vias 192 vias No via failures...
Measurement of punch through voltage Measurements performed by Alex Chilingarov, University of Lancaster Description of the measurement The punch through voltage...
MATLAB scripts for Medipix2 analysis The Medipix2 USB interface produces output files that are just ASCII arrays containing the no. of photons detected by each pixel...
Medipix USB Medipix2 is a single photon counting pixel readout chip, developed by the CERN Medipix collaboration: http://medipix.web.cern.ch/MEDIPIX/Medipix2/indexMPIX...
On the Module assemble board, you place a piece of paper (to even out the vacuum) then a mechanical Si sensor AndrewBlue 2011 10 12 Module Gluing Testing...
Information on module testing at Glasgow Introduction Modules can be tested using the HSIO system in a similar fashion to hybrid testing Below are notes that should...
RichardBates 26 Jan 2009 The Glasgow group has developed a system to fabricate Aluminium tracks on glass substrates to be used a pitch adaptors. The masks are designed...
Testbeam Reconstruction Details Installation: http://eutelescope.web.cern.ch/content/installation After installing and sourcing environment (build env.sh) the main...
Synopsys TCAD This is a suite of programs for semiconductor device simulation. The software allows you to design a device structure (including simulating its fabrication...
Whole wafer photos at reception Four electrical grade wafers with three hybrids on each one were delivered, and one failed wafer (w08) was supplied as a mechanical...
Introduction Four electrical grade wafers were delivered, plus one that was damaged during fabrication. Each wafer has three hybrids, hence the electrical grade wafers...
Telescope Simulation Telescope simulation is done with the Geant based simulation package AllPix. See the official pages for more detail and installation instructions...
DESY March 2012 PPS Testbeam This page documents the results of March 2012 PPS testbeam at DESY. The result can also be found in this presentation. Devices Devices...
Vetra ROOT Scripts ROOT ( http://root.cern.ch/ ) is a CERN data analysis framework, based around C . It has a lot of built in functions specifically designed to deal...
Descriprtion of the water testing of ASICS at Glasgow Introduction The following is a description of the setup used to test wafers of ABCn ASICS at Glasgow. The setup...
This is a subscription service to be automatically notified by e mail when topics change in this 1 web. This is a convenient service, so you do not have to come...
DetDev Web Preferences The following settings are web preferences of the DetDev web. These preferences overwrite the site level preferences in . and...
New probes station in Lab 341a Built by Wentworth instuirments Model No Ip Address Instruction manuals \\\Ppesmb\detdev01\GLADD Labs\cleanroom\wentworth...