AndrewBlue - 2012-02-20
Jigs
All are labelled with T to indicate the Top of each jig
J - Heights set up (From Liverpool)
A - Not shimmed (Glasgow)
B- Not set up (Glasgow)
C- Not shimmed (Glasgow)
D- Not set up (Glasgow)
Jig Setup
Gluing
Presentation on Gluing process flow at Glasgow
Hybrid_process.pptx
Testing
Hybrid Specific HSIO Configuration and test results
For testing hybrids it is important to use the
NoBCCSetup script with the following settings:
e->ConfigureVariable(10016, 0x7883); e->Sleep(10);
e->ConfigureVariable(10023, 0x00A0); e->Sleep(10);
It is necessary to set the
L1Delay in the module config file to 129 (was originally set to 132 for BCC), also the st_system_config has to be modified to use the J37 IDC on
HSIO, setting s0/s1 to 2 0 respectively and the d0/d1 delays to 20.
https://twiki.cern.ch/twiki/bin/viewauth/Atlas/ShortStripsHybridLiverpool
Inventory