Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 8 to 8 | ||||||||
J - Heights set up (From Liverpool) | ||||||||
Changed: | ||||||||
< < | A - Not set up (Glasgow) | |||||||
> > | A - Not shimmed (Glasgow) | |||||||
B- Not set up (Glasgow) | ||||||||
Changed: | ||||||||
< < | C- Not set up (Glasgow) | |||||||
> > | C- Not shimmed (Glasgow) | |||||||
D- Not set up (Glasgow) |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Jigs | ||||||||
Changed: | ||||||||
< < | There are 2 of each jig sets: named A + B | |||||||
> > | All are labelled with T to indicate the Top of each jig | |||||||
Changed: | ||||||||
< < | All are labeleld with T to indicate the Top of each jig | |||||||
> > | J - Heights set up (From Liverpool) | |||||||
Changed: | ||||||||
< < |
28th February
| |||||||
> > | A - Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | ||||||||
> > | B- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | 29th Feb | |||||||
> > | C- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | Picked up bad asics | |||||||
> > | D- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | ||||||||
> > | Jig Setup | |||||||
Changed: | ||||||||
< < | Wed 7th | |||||||
> > | Gluing | |||||||
Changed: | ||||||||
< < | ||||||||
> > | Presentation on Gluing process flow at Glasgow | |||||||
Changed: | ||||||||
< < | Used glue with glass slides
20 Glass ASICS : 0.86g
20 ASICS: 0.83g
Glass slide : 1.96g
Glass ASICS + Slide = 2.82g
After Gluing. 3.05g
Glue used = 0.23g
Notes:
Mon 12th
Tues
| |||||||
> > | Hybrid_process.pptx | |||||||
TestingHybrid Specific HSIO Configuration and test results | ||||||||
Line: 75 to 36 | ||||||||
https://twiki.cern.ch/twiki/bin/viewauth/Atlas/ShortStripsHybridLiverpool![]() Inventory\ No newline at end of file | ||||||||
Added: | ||||||||
> > |
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 56 to 56 | ||||||||
| ||||||||
Added: | ||||||||
> > |
Tues
| |||||||
TestingHybrid Specific HSIO Configuration and test results |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 47 to 47 | ||||||||
| ||||||||
Added: | ||||||||
> > | Mon 12th
| |||||||
TestingHybrid Specific HSIO Configuration and test results |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 42 to 42 | ||||||||
Glue used = 0.23g Notes: | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
|
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 23 to 23 | ||||||||
| ||||||||
Added: | ||||||||
> > | Wed 7th
| |||||||
TestingHybrid Specific HSIO Configuration and test results |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 9 to 9 | ||||||||
All are labeleld with T to indicate the Top of each jig
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > | 28th February
29th FebPicked up bad asics | |||||||
Testing |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Line: 14 to 14 | ||||||||
| ||||||||
Added: | ||||||||
> > | TestingHybrid Specific HSIO Configuration and test results For testing hybrids it is important to use the NoBCCSetup script with the following settings: e->ConfigureVariable(10016, 0x7883); e->Sleep(10);e->ConfigureVariable(10023, 0x00A0); e->Sleep(10); It is necessary to set the L1Delay in the module config file to 129 (was originally set to 132 for BCC), also the st_system_config has to be modified to use the J37 IDC on HSIO, setting s0/s1 to 2 0 respectively and the d0/d1 delays to 20. https://twiki.cern.ch/twiki/bin/viewauth/Atlas/ShortStripsHybridLiverpool ![]() | |||||||
Inventory |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
JigsThere are 2 of each jig sets: named A + B All are labeleld with T to indicate the Top of each jig
Inventory |