AndrewBlue 2011 10 12 The normal set of electrical tests that are conducted for both hybrids and modules are as follows (conducted sequentially): Strobe Delay...
AndrewBlue 2012 02 20 Jigs All are labelled with T to indicate the Top of each jig J Heights set up (From Liverpool) A Not shimmed (Glasgow) B Not set up (Glasgow...
Title Article text. This page will detail the scans made by ITSDAQ necessary to test DAQloads, Hybrids and Modules ITSDAQ HCC Chip ID Strobe Delay 3pt Gain...
Lab and software information If you`ve got any documentation, test procedures or code for lab equipment and software, please add it! Readout Setups Beetle...
On the Module assemble board, you place a piece of paper (to even out the vacuum) then a mechanical Si sensor AndrewBlue 2011 10 12 Module Gluing Testing...
Information on module testing at Glasgow Introduction Modules can be tested using the HSIO system in a similar fashion to hybrid testing Below are notes that should...
Descriprtion of the water testing of ASICS at Glasgow Introduction The following is a description of the setup used to test wafers of ABCn ASICS at Glasgow. The setup...
Hybrids Wire Bonding Hybrids (docs, pics) Modules Wire Bonding Modules (docs, pics) ASICS Wire Bonding Asics (docs, pics) Documents General docs, presentations...
Number of topics: 8

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback