Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Jigs | ||||||||
Changed: | ||||||||
< < | There are 2 of each jig sets: named A + B | |||||||
> > | All are labelled with T to indicate the Top of each jig | |||||||
Changed: | ||||||||
< < | All are labeleld with T to indicate the Top of each jig | |||||||
> > | J - Heights set up (From Liverpool) | |||||||
Changed: | ||||||||
< < |
28th February
| |||||||
> > | A - Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | ||||||||
> > | B- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | 29th Feb | |||||||
> > | C- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | Picked up bad asics | |||||||
> > | D- Not set up (Glasgow) | |||||||
Changed: | ||||||||
< < | ||||||||
> > | Jig Setup | |||||||
Changed: | ||||||||
< < | Wed 7th | |||||||
> > | Gluing | |||||||
Changed: | ||||||||
< < | ||||||||
> > | Presentation on Gluing process flow at Glasgow | |||||||
Changed: | ||||||||
< < | Used glue with glass slides
20 Glass ASICS : 0.86g
20 ASICS: 0.83g
Glass slide : 1.96g
Glass ASICS + Slide = 2.82g
After Gluing. 3.05g
Glue used = 0.23g
Notes:
Mon 12th
Tues
| |||||||
> > | Hybrid_process.pptx | |||||||
TestingHybrid Specific HSIO Configuration and test results | ||||||||
Line: 75 to 36 | ||||||||
https://twiki.cern.ch/twiki/bin/viewauth/Atlas/ShortStripsHybridLiverpool![]() Inventory\ No newline at end of file | ||||||||
Added: | ||||||||
> > |
|