-- AndrewBlue - 2011-10-12

Information for ATLAS Strip upgrade work at Glasgow

  • HSIO Information of the operating the readout system

  • Hybrid Assembly and operation of Hybrids

  • Module Assembly and operation of Modules

  • Wire bonding Info on wire bonidn of asics, hybrides and modules


This topic: DetDev > WebHome > ATLASStripUpgrade
Topic revision: r3 - 2011-10-31 - AndrewBlue
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback