Agenda 1. CP6 discussion: do we dice at Micron or get a new set of masks made? Paul 2. Module production update, Richard 3. Update on wafer testing, John M 4. Discussion of pixel fest agenda, all If you want to add anything, please let me know.
=== Attending: C. Buttar, R. Bates, A. Stewart, J. Matheson, K. Wraight, K. Sexton, J. Pater, R. Plackett, F. Munoz, I. Tsurin, M. Milovanovic Indico page: https://indico.cern.ch/event/351594/ Richard Plackett from Oxford was welcomed to the meeting. Oxford are considering doing pixel module assembly during production. 1. Dicing at Micron Richard B will contact Micron and the dicing company used by John Lipp about cost and time for dicing CP6, and send round an email. 2. Module production First CP6 wafer has been bump-bonded. CP6 Quads: 5 quads made up, two damaged during visual inspection. Reason was noted and will be avoided in future. Distribution: 2 quads for irradiation --> Liverpool for bonding; 1 baseline in Glasgow. Also want to identify 1 quad for thermal runaway measurements; Richard B has identified an assembled quad that can be used. CP6 singles All singles made up (6). All I-Vs look ok, wafer 3009-8. Richard B will update sharepoint. Distribution 3 to Liverpool for bonding & testing, 1 to go to Francesca in Manchester 3 at Glasgow for bonding & testing 2nd wafer has UBM and will be flipped at Advacam this week once Sami is back from NSS. CP5 AC/DC sensors: all 12 good assemblies have been made. 4 at Glasgow and 8 at Liverpool. Thinned modules: 1 wafer with SCL at Advacam. Some die have been returned to Cea/Leti for TDM measurements. Sami had done some flip-chipping trials. The die are very flat on the tool but after a tack bond and reflow he did not see good contact. These are preliminary results and Sami has more to do. Comments from Sami: worried that UBM is not sufficiently wettable and SAC solder may be an issue. Another possibility to be considered is to use Cu as an SCL. This has been done by Medipix where they have used Cu as an redistribution layer and these devices have shown no change in bow with temperature. 3. Module assembly Ilya has discussed getting the module assembly jig made in Liverpool workshop. It has been proposed that this is done by an apprentice. This has low priority and Paul needs to be negotiate with workshop management. Gluing studies are required. This can be done by a student and Ilya will discuss with Tim Jones. A stencil with 9 patterns will be ordered. There will be a meeting at RAL to discuss module assembly. Ilya will submit his new hybrid design to Quick Circuits and get 20 hybrids made and stuffed. MUX and PSP chip will be added as separate boards once they are available. A flex to RJ45 board is required. Ilya will send details to Richard B and Richard will get panasonic connectors from Liverpool. 4. Wafer testing Glasgow is reprobing 0.25 of a wafer probed at RAL to confirm results. Expect there will be 5 wafers probed between Glasgow & RAL by Christmas. John and Andrew will produce a write up on the testing procedure and results. RAL is reprobing a round-robin wafer from LBL. The green, yellow, red, blue yields broadly agree. John is investigating differences. Craig will check FE-I4 stock and confirm what remains to be tested. 5. Agenda for Pixel Fest. The outline agenda is at: https://indico.cern.ch/event/351038/ It will be discussed at the next meeting. 6. Testbeam studies (see slides on indico page) Francesca reported on results with 3D sensor at recent SPS testbeam. A strange pattern in the hit map was observed, see slide 9. It appears to be a region of low efficiency. No-one recognised this effect. Kenny will discuss with Francesca. 7. AC/DC sensor characterisation (see slides on indico page) Marko presented characterisation of the AC/DC sensors. He notices lower noise with the USBpix system, as he has seen before. AC devices have lower noise than DC devices. 90-Sr source scans indicate that the DC sensors have a slightly larger signal than AC sensors, ~6.4ToT vs 5.9ToT on plateau. There was only a brief discussion due to lack of time this will be revisited at the next meeting. Please send me comments and/or corrections by Monday 24/11. I send round corrected minutes and put them on the indico page. |