Revision 392016-05-16 - JohnLipp

Line: 1 to 1
 
META TOPICPARENT name="Meetings__Wikis"

Pixel Weekly

Line: 8 to 8
  In general, indico pages are listed in: https://indico.cern.ch/categoryDisplay.py?categId=547
Date Indico page Other notes/docs (e.g. uploads to PUUKA Twiki)
Changed:
<
<
4th Feb https://indico.cern.ch/event/493370/

1. Update on Pixel readout ,Andeas

2. Irradiation programme, Paul -discussion

3. Multi-module status, Ilya

4. Brief updates

1. Module production, Richard

2. Micron update, Craig

3. Itk week talks

5. AOB

21-Jan-2016 https://indico.cern.ch/event/486293/

1. Report on thinned modules and module production, Richard, 20mins

2. Module results, Ilya, 20mins

3. Status of hybrid production, Sneha, 10mins

4. Status of ASIC testing, John, 10mins 5. AOB

12-Nov-2015 https://indico.cern.ch/e/461536  
15th Oct https://indico.cern.ch/e/455163  
1st Oct https://indico.cern.ch/e/450601  
3rd Sept 2015 http://indico.cern.ch/e/442908 .
20th Aug 2015 http://indico.cern.ch/e/440077

Agenda:

  1. Module assembly Ilya/Paul
  2. Hybrid production: Sneha
  3. Followup on encapsulation: Kirk
  4. Reliability workshop report part 2: Kirk
6th Aug 2015 https://indico.cern.ch/event/436949/

Agenda

  1. Status of module production: Richard
  2. Report on module assembly: Paul/Ilya
  3. Discussion of flex and tape designs: Ilya/Sneha
  4. Review of parylene studies: Kirk
  5. Results of parylene studies: Paul
  6. Summary of Reliability & Risk workshop: Kirk
9th July 2015 https://indico.cern.ch/event/408121/

Agenda

  1. Report on module assembly: Paul
  2. Status of module mini-production: Craig (20mins including discussion)
  3. AOB
18th June 2015 http://indico.cern.ch/e/403008  
28th May 2015 https://indico.cern.ch/event/397116/

11:15-13:00

Agenda

  1. Module assembly of CMS Phase-I pixel upgrade: Kirk (20mins)
  2. Module mini-production: Craig (20mins including discussion)
  3. UK preparations for module assembly: Craig (30mins including discussion)
  4. Report on high rate bump bonding: Richard (20mins including discussion)

Items 3 & 4 will be reported at tomorrow's ITk module meeting. The indico page is at: https://indico.cern.ch/event/396129/

7th May 2015 https://indico.cern.ch/event/391195/
  1. Update on thinned module bump bonding, Richard 15mins
  2. Update on RAL BB, John L, 15mins
  3. Status of multimodule testing, Richard/Sneha, 15mins
  4. Hybrid to module assembly work, Ilya/Paul, 15mins
  5. AOCB
  1. Update on thinned module bump bonding, Richard Bates
    See Richard Slides.
    Richard presented an update on thinned module assembly. This focused on work at Advacam on flip chip of assembly. Several different techniques have been looked at: Au UBM to replace current Advacam transition metal UBM, solder on sensors to give a solder-solder bond and a new reflow method: "Advacam reflow method". 5 samples with 100um thick readout chips and 300um single chip sensors, some have SCL and some do not. Good bump yields with solder-solder and also Advacam reflow method.
    More samples being made.
    Need extend Advacam reflow method to quads and check it is compatible with large scale production.
    Samples will be subjected to thermal cycling but it was pointed out that glues had failed on strip samples at -50C. Test samples will be thermally cycled before the samples.
  2. Module production exercise
    See Richard slides (last slide)
    Richard reported that at the pixel design group large scale bump bonding was discussed (https://indico.cern.ch/event/392019/). The bump bonding capacity needs to be understood to support the case for increasing the pixel area to a 5th and 6th layer. The aim is to place orders with a number of vendors: IZM, Selex, Advacam/Cea-Leti, HPK and see if the meet required production rates and quality. It would be better to have more vendors, around 6 so that we have a choice rather than being limited to using the current 4.
    Daniella pointed out that RTI have worked on bump bonding for CMS and should be considered. Vitaliy Fadyev is the currently the contact for them. Daniella will contact Vitality regarding RTI.
    RAL have been considered as small site that could work on the inner layer given their limited resources. However, John reported that the following discussions, he had been given the go ahead to look at developing 300mm capability.
    We need to consider module production, hybrid assembly and final testing.
    The programme of bump bonding needs to be complete by end of the year so that decisions can be made on the layout. The aim from the UK is make and test 50 assemblies with CEA-Leti & Advacam, and also a similar number with RAL. Craig will organise a meeting with Craig, John L, Richard and Paul to discus the programme for this.
  3. Update on RAL BB, John Lipp
    See John's slides
    John gave an update on the studies to understand the quality of the bumps. In the "old" daisy chain samples that included Au in the UBM, intermetallics were observed, confirming that removing the Au from the UBM was correct. The results from the module that did not have Au in the UBM showed no evidence of intermetallics. The UBM and inter-bump interface appear to be good. The remaining possible problems are that the parallelism of the FE-I4 and sensor may not be good enough or there may have been Cr contamination from resputtering. If it is the resputtering, this has now been fixed. Next step is to make more modules and evaluate them.
  4. Multi-module testing, Kenny
    See Kenny' slides
    Kenny showed the progress with the multimodule testing system. After some teething problems with connections the system is now setup to test up to 16 chips = 4 quads. This will start with modules on PCBs but will move to testing modules with flex hybrids on the half disk. The serial powering system is up and runnning with SCTDAQ and an interlock system.
  5. Hybrid mounting, Paul
    2 quads ready for sending to Glasgow, will be sent up together with the assembly jigs.
    Glasgow will send 6 FR4 populated hybrids to Liverpool.
    Richard reported that hybrids from Flexible technologies had cracks. This appears to be due to using a flexible solder resist rather than polyamide.
    There was a brief discussion on using rice paper as a replacement for the gluing stencil. Ilya will be asked to report on this at the next meeting.
    Kirk mentioned his experience with using a rubber stamp method for glue dispensing. He will report on this at the next meeting .
  6. AOB
    Paul reported that Sussane and Wuppertal cofirmed that we will get 40 untested PPSP chips. This will be in August/September.

Paul Dervan noted: This was the glue/paint that failed at about ~40C: http://uk.rs-online.com/web/p/conductive-adhesives/1863593/

16th April 2015 https://indico.cern.ch/event/388245/
  1. Hybrid to module assembly and electrical testing of modules with flex hybrids: Ilya/Paul
  2. Report on In bump bonding at RAL: John Lipp
  3. Summary from DAQ meeting: Craig
  4. Input to RD53 sensor discussion: All
  5. AUW talks: All
19th March 2015 https://indico.cern.ch/event/382297/

11.15.

Agenda

  1. Module assembly and flex status: Paul/Ilya
  2. Multi-module test status: Richard
  3. Stuff: USBpix order, PPSP chip, PixelFest, DAQ meeting
  4. AoB

Can groups send Craig information on what USBPix systems you have and whether they are working or not. Andreas Korn is organising an order for new MIO3 and MMC3 cards.

5th Mar 2015 https://indico.cern.ch/event/368657/ 11:15am
25th Feb 2015 https://indico.cern.ch/e/373270 11:15am
22nd Jan 2015  

UK WP1: Meeting Summary
22/01/15
Meeting Commenced: 11:20
Present:
Liverpool: P.Dervan, M. Milovanovic, I. Tsurin
Oxford: D. Bortoletto
Glasgow: K. Doonan
RAL: J. Matterson, I. Wilmut, J. Lipp
Manchester: J. Pater, G. Miller
Apologies: C. Buttar, C. Da Via, V O’Shea
1. Summary of the meeting:
Liverpool:
• Mike, the Liverpool wire bonder has had an operation. He will be off work for three weeks. So there was no news on the sensors/module side of things.
• The assembly jig is nearly finished (see the slides from Ilya on the indico site). Quotes from three companies have just been received for the glue stencils. Would everything is ready we would like to have a review of the process and jig.
• Paul has been in touch with the German groups about the PSPP chip. They are making a new submission at the end of February. The UK would like some (including the strip
group). We will go and visit the German groups in the next month or so.
• If we redesign the hybrid with the PSPP chip the tapes and EOS card will need to be modified. Jo mentioned that an email had just been sent around about a face to face
meeting about the EOS card. The PSPP has now been included.


Manchester:
• Jo introduced Graham Miller. He is Manchester’s new electrical engineer.
• Jo mentioned the face to face EOS meeing. This will happen in early February. A doodle pole has been sent around.
• There will be a test beam at DESY around Easter time. The beam will be setup for 3D devices. Do you want to send the AC devices?

Oxford:
• A probe station has been ordered.
• The new lab will be ready around May time.
• Lots of work has been done on the CMOS sensors. These will be irradiated next Tuesday in Birmingham.

Glasgow:
• Tape tests will happen soon.
• Kenny has been working on the reconstruction of test beam data for sensors with different geometries

RAL:
• Wafer (ASIC) probing continues.
• More wafers are needed.
• Stages need to be ordered for the module mounting system
• Bump bonding of CP6 wafers is on going.
• The GDS file for the top metal is needed.
• Work on QUAD bump bonding is progressing.
• The modules with low bump yield are being investigated.
• A low deposition system is being looked at, to reduce the out-gassing.
• John Lipp requested that the next few meeting were announced in advance. To help with planning.
•
AOB:
• There is a RCE/COB workshop in Oxford next week.
• The next few meeting will be at 11:15am on the 5th Feb, 19th Feb and 5th March.

>
>
2016.05.12 https://indico.cern.ch/event/528140/  
2016.02.04 https://indico.cern.ch/event/493370/

1. Update on Pixel readout ,Andeas

2. Irradiation programme, Paul -discussion

3. Multi-module status, Ilya

4. Brief updates

1. Module production, Richard

2. Micron update, Craig

3. Itk week talks

5. AOB

2016.01.21 https://indico.cern.ch/event/486293/

1. Report on thinned modules and module production, Richard, 20mins

2. Module results, Ilya, 20mins

3. Status of hybrid production, Sneha, 10mins

4. Status of ASIC testing, John, 10mins 5. AOB

2015.11.12 https://indico.cern.ch/e/461536  
2015.10.15 https://indico.cern.ch/e/455163  
2015.10.01 https://indico.cern.ch/e/450601  
2015.09.03 http://indico.cern.ch/e/442908 .
2015.08.20 http://indico.cern.ch/e/440077

Agenda:

  1. Module assembly Ilya/Paul
  2. Hybrid production: Sneha
  3. Followup on encapsulation: Kirk
  4. Reliability workshop report part 2: Kirk
2015.08.06 https://indico.cern.ch/event/436949/

Agenda

  1. Status of module production: Richard
  2. Report on module assembly: Paul/Ilya
  3. Discussion of flex and tape designs: Ilya/Sneha
  4. Review of parylene studies: Kirk
  5. Results of parylene studies: Paul
  6. Summary of Reliability & Risk workshop: Kirk
2015.07.09 https://indico.cern.ch/event/408121/

Agenda

  1. Report on module assembly: Paul
  2. Status of module mini-production: Craig (20mins including discussion)
  3. AOB
2015.06.18 http://indico.cern.ch/e/403008  
2015.05.28 https://indico.cern.ch/event/397116/

11:15-13:00

Agenda

  1. Module assembly of CMS Phase-I pixel upgrade: Kirk (20mins)
  2. Module mini-production: Craig (20mins including discussion)
  3. UK preparations for module assembly: Craig (30mins including discussion)
  4. Report on high rate bump bonding: Richard (20mins including discussion)

Items 3 & 4 will be reported at tomorrow's ITk module meeting. The indico page is at: https://indico.cern.ch/event/396129/

2015.05.07 https://indico.cern.ch/event/391195/
  1. Update on thinned module bump bonding, Richard 15mins
  2. Update on RAL BB, John L, 15mins
  3. Status of multimodule testing, Richard/Sneha, 15mins
  4. Hybrid to module assembly work, Ilya/Paul, 15mins
  5. AOCB
  1. Update on thinned module bump bonding, Richard Bates
    See Richard Slides.
    Richard presented an update on thinned module assembly. This focused on work at Advacam on flip chip of assembly. Several different techniques have been looked at: Au UBM to replace current Advacam transition metal UBM, solder on sensors to give a solder-solder bond and a new reflow method: "Advacam reflow method". 5 samples with 100um thick readout chips and 300um single chip sensors, some have SCL and some do not. Good bump yields with solder-solder and also Advacam reflow method.
    More samples being made.
    Need extend Advacam reflow method to quads and check it is compatible with large scale production.
    Samples will be subjected to thermal cycling but it was pointed out that glues had failed on strip samples at -50C. Test samples will be thermally cycled before the samples.
  2. Module production exercise
    See Richard slides (last slide)
    Richard reported that at the pixel design group large scale bump bonding was discussed (https://indico.cern.ch/event/392019/). The bump bonding capacity needs to be understood to support the case for increasing the pixel area to a 5th and 6th layer. The aim is to place orders with a number of vendors: IZM, Selex, Advacam/Cea-Leti, HPK and see if the meet required production rates and quality. It would be better to have more vendors, around 6 so that we have a choice rather than being limited to using the current 4.
    Daniella pointed out that RTI have worked on bump bonding for CMS and should be considered. Vitaliy Fadyev is the currently the contact for them. Daniella will contact Vitality regarding RTI.
    RAL have been considered as small site that could work on the inner layer given their limited resources. However, John reported that the following discussions, he had been given the go ahead to look at developing 300mm capability.
    We need to consider module production, hybrid assembly and final testing.
    The programme of bump bonding needs to be complete by end of the year so that decisions can be made on the layout. The aim from the UK is make and test 50 assemblies with CEA-Leti & Advacam, and also a similar number with RAL. Craig will organise a meeting with Craig, John L, Richard and Paul to discus the programme for this.
  3. Update on RAL BB, John Lipp
    See John's slides
    John gave an update on the studies to understand the quality of the bumps. In the "old" daisy chain samples that included Au in the UBM, intermetallics were observed, confirming that removing the Au from the UBM was correct. The results from the module that did not have Au in the UBM showed no evidence of intermetallics. The UBM and inter-bump interface appear to be good. The remaining possible problems are that the parallelism of the FE-I4 and sensor may not be good enough or there may have been Cr contamination from resputtering. If it is the resputtering, this has now been fixed. Next step is to make more modules and evaluate them.
  4. Multi-module testing, Kenny
    See Kenny' slides
    Kenny showed the progress with the multimodule testing system. After some teething problems with connections the system is now setup to test up to 16 chips = 4 quads. This will start with modules on PCBs but will move to testing modules with flex hybrids on the half disk. The serial powering system is up and runnning with SCTDAQ and an interlock system.
  5. Hybrid mounting, Paul
    2 quads ready for sending to Glasgow, will be sent up together with the assembly jigs.
    Glasgow will send 6 FR4 populated hybrids to Liverpool.
    Richard reported that hybrids from Flexible technologies had cracks. This appears to be due to using a flexible solder resist rather than polyamide.
    There was a brief discussion on using rice paper as a replacement for the gluing stencil. Ilya will be asked to report on this at the next meeting.
    Kirk mentioned his experience with using a rubber stamp method for glue dispensing. He will report on this at the next meeting .
  6. AOB
    Paul reported that Sussane and Wuppertal cofirmed that we will get 40 untested PPSP chips. This will be in August/September.

Paul Dervan noted: This was the glue/paint that failed at about ~40C: http://uk.rs-online.com/web/p/conductive-adhesives/1863593/

2015.04.16 https://indico.cern.ch/event/388245/
  1. Hybrid to module assembly and electrical testing of modules with flex hybrids: Ilya/Paul
  2. Report on In bump bonding at RAL: John Lipp
  3. Summary from DAQ meeting: Craig
  4. Input to RD53 sensor discussion: All
  5. AUW talks: All
2015.03.19 https://indico.cern.ch/event/382297/

11.15.

Agenda

  1. Module assembly and flex status: Paul/Ilya
  2. Multi-module test status: Richard
  3. Stuff: USBpix order, PPSP chip, PixelFest, DAQ meeting
  4. AoB

Can groups send Craig information on what USBPix systems you have and whether they are working or not. Andreas Korn is organising an order for new MIO3 and MMC3 cards.

2015.03.05 https://indico.cern.ch/event/368657/ 11:15am
2015.02.25 https://indico.cern.ch/e/373270 11:15am
2015.01.22  

UK WP1: Meeting Summary
22/01/15
Meeting Commenced: 11:20
Present:
Liverpool: P.Dervan, M. Milovanovic, I. Tsurin
Oxford: D. Bortoletto
Glasgow: K. Doonan
RAL: J. Matterson, I. Wilmut, J. Lipp
Manchester: J. Pater, G. Miller
Apologies: C. Buttar, C. Da Via, V O’Shea
1. Summary of the meeting:
Liverpool:
• Mike, the Liverpool wire bonder has had an operation. He will be off work for three weeks. So there was no news on the sensors/module side of things.
• The assembly jig is nearly finished (see the slides from Ilya on the indico site). Quotes from three companies have just been received for the glue stencils. Would everything is ready we would like to have a review of the process and jig.
• Paul has been in touch with the German groups about the PSPP chip. They are making a new submission at the end of February. The UK would like some (including the strip
group). We will go and visit the German groups in the next month or so.
• If we redesign the hybrid with the PSPP chip the tapes and EOS card will need to be modified. Jo mentioned that an email had just been sent around about a face to face
meeting about the EOS card. The PSPP has now been included.


Manchester:
• Jo introduced Graham Miller. He is Manchester’s new electrical engineer.
• Jo mentioned the face to face EOS meeing. This will happen in early February. A doodle pole has been sent around.
• There will be a test beam at DESY around Easter time. The beam will be setup for 3D devices. Do you want to send the AC devices?

Oxford:
• A probe station has been ordered.
• The new lab will be ready around May time.
• Lots of work has been done on the CMOS sensors. These will be irradiated next Tuesday in Birmingham.

Glasgow:
• Tape tests will happen soon.
• Kenny has been working on the reconstruction of test beam data for sensors with different geometries

RAL:
• Wafer (ASIC) probing continues.
• More wafers are needed.
• Stages need to be ordered for the module mounting system
• Bump bonding of CP6 wafers is on going.
• The GDS file for the top metal is needed.
• Work on QUAD bump bonding is progressing.
• The modules with low bump yield are being investigated.
• A low deposition system is being looked at, to reduce the out-gassing.
• John Lipp requested that the next few meeting were announced in advance. To help with planning.
•
AOB:
• There is a RCE/COB workshop in Oxford next week.
• The next few meeting will be at 11:15am on the 5th Feb, 19th Feb and 5th March.

 
13th Nov 2014
 https://indico.cern.ch/event/351594/ 
Modification key is wp1
 Vidyo pin: 54321
Agenda
1. CP6 discussion: do we dice at Micron or get a new set of masks made? Paul
2. Module production update, Richard
3. Update on wafer testing, John M
4. Discussion of pixel fest agenda, all
 
If you want to add anything, please let me know.

===

Attending: C. Buttar, R. Bates, A. Stewart, J. Matheson, K. Wraight, K.

Sexton, J. Pater, R. Plackett, F. Munoz, I. Tsurin, M. Milovanovic

Indico page: https://indico.cern.ch/event/351594/

Richard Plackett from Oxford was welcomed to the meeting. Oxford are considering doing pixel module assembly during production.

1. Dicing at Micron

Richard B will contact Micron and the dicing company used by John Lipp about cost and time for dicing CP6, and send round an email.

2. Module production

First CP6 wafer has been bump-bonded.

CP6 Quads: 5 quads made up, two damaged during visual inspection. Reason was noted and will be avoided in future.

Distribution: 2 quads for irradiation --> Liverpool for bonding; 1 baseline in Glasgow.

Also want to identify 1 quad for thermal runaway measurements; Richard B has identified an assembled quad that can be used.

CP6 singles All singles made up (6). All I-Vs look ok, wafer 3009-8.

Richard B will update sharepoint.

Distribution

3 to Liverpool for bonding & testing, 1 to go to Francesca in Manchester

3 at Glasgow for bonding & testing

2nd wafer has UBM and will be flipped at Advacam this week once Sami is back from NSS.

CP5 AC/DC sensors: all 12 good assemblies have been made. 4 at Glasgow and 8 at Liverpool.

Thinned modules: 1 wafer with SCL at Advacam. Some die have been returned to Cea/Leti for TDM measurements. Sami had done some flip-chipping trials. The die are very flat on the tool but after a tack bond and reflow he did not see good contact. These are preliminary results and Sami has more to do. Comments from Sami: worried that UBM is not sufficiently wettable and SAC solder may be an issue.

Another possibility to be considered is to use Cu as an SCL. This has been done by Medipix where they have used Cu as an redistribution layer and these devices have shown no change in bow with temperature.

3. Module assembly

Ilya has discussed getting the module assembly jig made in Liverpool workshop. It has been proposed that this is done by an apprentice. This has low priority and Paul needs to be negotiate with workshop management. Gluing studies are required. This can be done by a student and Ilya will discuss with Tim Jones. A stencil with 9 patterns will be ordered.

There will be a meeting at RAL to discuss module assembly.

Ilya will submit his new hybrid design to Quick Circuits and get 20 hybrids made and stuffed. MUX and PSP chip will be added as separate boards once they are available. A flex to RJ45 board is required. Ilya will send details to Richard B and Richard will get panasonic connectors from Liverpool.

4. Wafer testing

Glasgow is reprobing 0.25 of a wafer probed at RAL to confirm results.

Expect there will be 5 wafers probed between Glasgow & RAL by Christmas.

John and Andrew will produce a write up on the testing procedure and results.

RAL is reprobing a round-robin wafer from LBL. The green, yellow, red, blue yields broadly agree. John is investigating differences.

Craig will check FE-I4 stock and confirm what remains to be tested.

5. Agenda for Pixel Fest.

The outline agenda is at: https://indico.cern.ch/event/351038/

It will be discussed at the next meeting.

6. Testbeam studies (see slides on indico page) Francesca reported on results with 3D sensor at recent SPS testbeam. A strange pattern in the hit map was observed, see slide 9. It appears to be a region of low efficiency. No-one recognised this effect. Kenny will discuss with Francesca.

7. AC/DC sensor characterisation (see slides on indico page) Marko presented characterisation of the AC/DC sensors. He notices lower noise with the USBpix system, as he has seen before. AC devices have lower noise than DC devices. 90-Sr source scans indicate that the DC sensors have a slightly larger signal than AC sensors, ~6.4ToT vs 5.9ToT on plateau.

There was only a brief discussion due to lack of time this will be revisited at the next meeting.

Please send me comments and/or corrections by Monday 24/11. I send round corrected minutes and put them on the indico page.

29th Oct 2014  
Dear All,
Notes from WP1 meeting 29/10
Present: A. Stewart, J. Pater, P. Dervan, C. Buttar, K. Doonan, M. 
Milovanovic
 
Craig discussed the proposal by Anna Macciholo regarding having a single 
talk on sensors and other areas in the module meeting. It was agreed 
that this was reasonable and that we should see if it works. Craig will 
reply.
 
Craig reported that there was concern expressed by 
Advacam regarding dicing of CP6 sensors due to the mistake in the mask design. As previously discussed, 
a plan had been sent to to Advacam that sacrificed single sensors. It 
had also been agreed to have a wafer diced at Micron to see if this 
could avoid sacrificing the single sensors and having an extended edge 
on one of the quads.
The question was raised as to whether we should get a new CP6 mask set 
that is better for dicing. It was agreed we should investigate dicing 
with Micron first.
 
 *Paul will discuss dicing at Micron with Ilya and Gian to check* 
 *availability and cost and report at the next meeting.* 
 
Craig reported that the he had discussed the probe marks on the chips 
shown in Marko's slides. He said it was unusual to probe a chip twice 
but this had been done from time to time as required. It had not been a 
problem during production. He could not make a comment on dicing.
It was agreed that new modules will undergo a visual inspection to look 
at the quality of dicing, probe marks, scratches and chips. A record 
will be kept for each module.
 
 *Advacam also have a visual inspection sheet and Richard will ask if they* 
 *can be sent to us along with a module.* 
 
Please send me comments and corrections.
 
Craig & Paul
16th Oct 2014 https://indico.cern.ch/event/346944/  
 