Difference: ProductionRota (6 vs. 7)

Revision 72012-10-16 - DanProtopopescu

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NA62 Monte Carlo Grid Production Rota

Line: 38 to 38
  The person in charge must do the following:
Changed:
<
<
  1. keep an eye on the jobs list and make sure we 200 jobs RUNNING at all times and not more than 100 SCHEDULED.* ALERT! Please note that these numbers will change when new resources are added. Check this number at the beginning of each shift.
>
>
  1. keep an eye on the jobs list and make sure we 200 jobs RUNNING at all times and not more than 50 SCHEDULED.* ALERT! Please note that these numbers will change when new resources are added. Check this number at the beginning of each shift.
 
  1. if queue is low (less than 100 RUNNING), use online script creator to submit a new batch of jobs
Changed:
<
<
  1. check production page to see if we've reached 100%
>
>
  1. check production page to see if we've reached 100%. If yes, then start next production round on the list.
 
  1. re-validate results weekly (every Monday) with the physics group (email Tonino to check the outputs on CAstor)
  2. notify production coordinator if any major errors occur
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback