Difference: ProductionRota (3 vs. 4)

Revision 42012-10-12 - DanProtopopescu

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NA62 Monte Carlo Grid Production Rota

Changed:
<
<
This wiki will contain information about and for the volunteers for the NA62 MC Grid production rota.
>
>
This wiki contains information about and for the volunteers for the NA62 MC Grid production rota. Check this page regularly for updates.
 

List of volunteers

Changed:
<
<
To be filled.
>
>
As of October 12, 2012 we have the following names: Antonio Cassese, Mark Slater, Philip Rubin.
 

Production plan

The production plan is located here:

Changed:
<
<
http://ppewww.physics.gla.ac.uk/~protopop/na62/mc/tools/index.php?task=production
>
>
http://na62.gla.ac.uk/index.php?task=production
  This displays a database-generated table that fills up along the way. New items will be added by the production coordinator as discussed at the Siena meeting in August 2012.

Grid Production Shifts

Changed:
<
<
GP "shifts" will not require too much work, and it is enough if the person on shift will check the production status every few hours or so. It is expected that GP 'shifts' will be at least a day long.
>
>
GP "shifts" will not require too much work, and it is enough if the person on shift will check the production status twice a day or so. It is expected that GP 'shifts' will be at least a day long.
 

How it all works

Line: 29 to 29
 
  • intervene if possible to fix the error(s)
  • notify the production coordinator if not possible to directly intervene to rectify the error
Added:
>
>
  • notify the site admin if jobs systematically fail at a given site
  • notify Janusz if outputs fail to be replicated on CERN Castor (labelled LS instead of CC in the files table)
 

Checklist

The person in charge must do the following:

  1. keep an eye on the jobs list and make sure we have 200+ jobs queued at all times
Changed:
<
<
  1. if queue is low, use online script creator to submit a new batch of jobs
>
>
  1. if queue is low, use online script creator to submit a new batch of jobs
 
  1. check production page to see if we've reached 100%
Changed:
<
<
  1. re-validate results weekly (every Tuesday) with the physics group
>
>
  1. re-validate results weekly (every Monday) with the physics group (email Tonino)
 
  1. notify production coordinator if any major errors occur

Troubleshooting

In case you find an error produced by the online interface, please immediately notify Dan, Janusz and Tonino.

Deleted:
<
<
-- DanProtopopescu - 2012-09-20
 
META FILEATTACHMENT attachment="NA62_requirements_table.pdf" attr="" comment="Production plan (August 2012)" date="1348235473" name="NA62_requirements_table.pdf" path="NA62_requirements_table.pdf" size="38998" stream="NA62_requirements_table.pdf" tmpFilename="/usr/tmp/CGItemp26671" user="DanProtopopescu" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback