Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
NA62 Monte Carlo Grid Production Shifts | ||||||||
Line: 10 to 10 | ||||||||
Keep the queue full, which means 200+ jobs running at all times, and less than 100 scheduled. | ||||||||
Changed: | ||||||||
< < | We run decay type 1, Kch2pipi0 simulations with software version v7/r193 at IC, RAL and BIR. Revision 193 is 5 times faster so we will run 6000 events runs. More sites will be included in the production, as soon as the software is installed on them. Check here![]() | |||||||
> > | We run decay type 1, Kch2pipi0 simulations with software version v7/r193 at IC, RAL, GLA and BIR. Revision 193 is 5 times faster so we will run 6000 events runs. More sites will be included in the production, as soon as the software is installed on them. Check here![]() | |||||||
Production jobs from the Kch2pipi0-1 production round have decay type 1, description set to "Kch2pipi0-1 production round", 1500 events for v6 runs and 6000 events for v7 runs. Please pay attention when submitting jobs. |