Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
NA62 Monte Carlo Grid Production Shifts | ||||||||
Line: 8 to 8 | ||||||||
Today's production plan | ||||||||
Added: | ||||||||
> > | Keep the queue full, which means 200+ jobs running at all times, and less than 100 scheduled. | |||||||
We run decay type 1, Kch2pipi0 simulations with software version v7/r193 at IC, RAL and BIR. Revision 193 is 5 times faster so we will run 6000 events runs. More sites will be included in the production, as soon as the software is installed on them. Check here![]() |