Difference: ProductionRota (14 vs. 15)

Revision 152012-10-23 - DanProtopopescu

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NA62 Monte Carlo Grid Production Shifts

Line: 36 to 36
  If all goes well, GP "shifts" will not require too much work. Shifts are defined as 9am to 9pm CERN time but it is enough if the person on shift checks the production status and submits jobs twice a day or so. Is problems arise, this might require another hour or so of your time, since you will not be expected to actually fix the problem but only to notify the admins.
Changed:
<
<

How it all works

>
>

What to do on shift

 
Changed:
<
<
MC jobs will be submitted by automaticall by cron jobs. The person overseeing the production (the "shift" taker) will have to check periodically if everything goes according to plan, and
>
>
MC jobs should be submitted manually. The person overseeing the production (the "shift" taker) will have to check periodically if everything goes according to plan, and
 
  • intervene if possible to fix the error(s)
  • notify the production coordinator if not possible to directly intervene to rectify the error
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback