Difference: ProductionHowto (13 vs. 14)

Revision 142012-10-24 - DanProtopopescu

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

NA62 Monte Carlo Production Howto

Line: 20 to 20
 
Changed:
<
<
The aim is to maintain the production rate at its maximum (whatever that is, depending on the resources available) and for this the person on shift must submit new jobs when the number of waiting and running jobs is low. How is low defined ? We should have 200 jobs RUNNING at all times and not more than 50 SCHEDULED.
>
>
The aim is to maintain the production rate at its maximum (whatever that is, depending on the resources available) and for this the person on shift must submit new jobs when the number of waiting and running jobs is low. How is low defined ? We should have more than 200 jobs RUNNING at all times and about 50 SCHEDULED.
 ALERT! Please note that these numbers will change when new resources are added. Check this number at the beginning of each shift.

Job submissions in production mode are done via the Scripter interface, as explained below.

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback