Difference: WireBonding (2 vs. 3)

Revision 32012-03-06 - AndrewBlue

Line: 1 to 1
 
META TOPICPARENT name="ATLASStripUpgrade"
-- AndrewBlue - 2012-02-20
Added:
>
>
Wire Bondging Trials

To achieve correct measurements as above (assuming samples are exactly the size designed)

Silicon (with DC) and 200um long AISC pad samples should be:

  • aligned in x
  • seperated (edge to edge) by 2812um or seperated from bondpad edge to bondpad edge by 3823um

To achieve correct measurements as above (assuming samples are exactly the size designed)

Silicon (with DC) and 200um long AISC pad samples should be:

  • seperated (edge to edge) in xb y 335um
  • seperated (edge to edge) in y by 1742um or sepereated from bond edge to bond edge by ????um
 
Hybrid Bonding Diagrams

https://twiki.cern.ch/twiki/pub/Atlas/ModuleAssembling4ATLASSCTUpgrade/Stave_Hybrid_WireBonding.pdf

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback