Difference: IBLTestBeam (3 vs. 4)

Revision 42011-04-20 - AndrewBlue

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

IBL Testbeam

e-group for IBL testbeam: atlas-ibl-testbeam@cern.ch

Added:
>
>
Testbeam runs
 
Changed:
<
<
2 Testbeam runs have been performed at DESY using the EUDET telescope. Information on the telescope can ber found here
>
>
2 Testbeam runs have been performed at DESY using the EUDET telescope. Information on the telescope can be found here
  http://www.eudet.org/e13/e21/e727/
Line: 19 to 20
  https://twiki.cern.ch/twiki/bin/viewauth/Atlas/IBL
Changed:
<
<
A CERN testbeam is currently schudeled for may 20th-13th June. To sign up for shifts go to
>
>
A CERN testbeam is currently scheduled for may 20th-13th June. To sign up for shifts go to
  http://doodle.com/488d4629pxc9tyed
Changed:
<
<

IBL testbeam weekly meetings

>
>

Analysis

THere are 2 parts to the data analysis for the testbeam

1) Track reconstruction

This is the trasnformation of the raw data files acquired by a set of data aquisition boards to high level objects like tracks crossing the telescope.

This done through the EUTelescope software. The description of how to install and run the software is given here

http://www-zeus.desy.de/~rubinsky/EUTelescope/index.html

2) Analysis

[To be completed]

IBL Testbeam Analysis Meetings

  There is a regular weekly testbeam phone meeting. Details of past meetings are given below.

April 19th 2011

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback